Specifications include, but are not limited to: 1 General Clearing And Grubbing 1.00 Lump Sum $0.00 $0.00 2 Large Tree Removal 7.00 Each $0.00 $0.00 3 Large Stump Removal 1.00 Each $0.00 $0.00 4 Excavation (Established Quantity) 2,222.00 Cu.Yds. $0.00 $0.00 5 Water 5.00 M.Gal $0.00 $0.00 6 Rock RipRap, Type B 838.00 Ton $0.00 $0.00 7 Salvaging And Placing Topsoil 2,270.00 Sq. Yds. $0.00 $0.00 8 Crushed Rock Surface Course 144.00 Ton $0.00 $0.00 9 Incorporating Crushed Rock For Base Course 3.00 Station $0.00 $0.00 10 Rental Of Crawler-Mounted Hydraulic Excavator, Fully Operated 4.00 Hour $0.00 $0.00 11 Rental Of Front End Loader, Fully Operated 4.00 Hour $0.00 $0.00 12 Rental Of Skid Loader, Fully Operated 4.00 Hour $0.00 $0.00 13 Rental Of Dump Truck, Fully Operated 4.00 Hour $0.00 $0.00 Total Group 1 = $0.00 Group 4 - Culverts 14 Remove Structure At Sta. 30+00 1.00 Each $0.00 $0.00 15 Excavation For Box Culverts 932.00 Cu.Yds. $0.00 $0.00 16 Excavation For Pipe, Pipe-Arch Culverts And Headwalls 70.00 Cu.Yds. $0.00 $0.00 17 Class 47B-3000 Concrete For Box Culverts 88.00 Cu.Yds. $0.00 $0.00 18 Reinforcing Steel For Box Culverts 11,139.00 Lbs. $0.00 $0.00 19 Crushed Rock Base Course For Box Culverts 61.00 Cu.Yds. $0.00 $0.00 20 Steel Sheet Piling For Turndowns 421.00 Sq.Ft. $0.00 $0.00 21 Tapping Concrete Box Culvert 3.00 Each $0.00 $0.00 22 18" Culvert Pipe, Type 3 65.80 Lin. Ft. $0.00 $0.00 23 24" Culvert Pipe, Type 3 21.50 Lin. Ft. $0.00 $0.00 24 24" Driveway Culvert, Type 3 30.00 Lin. Ft. $0.00 $0.00 25 18" Metal Headwall 2.00 Each $0.00 $0.00