Specifications include, but are not limited to: All metal rectangular shelter; 26’ x 36’ Hip End metal roof with 4:12 pitch. Dimension is overall roof size. A. Structural framing: structural steel tube minimum ASTM A500 grade B or coldformed box sections minimum A570 grade 55. “I” beams, tapered columns, open channels or wood products shall not be accepted. Anchor bolts can be inside or outside the columns, which ever is practical. B. Compression ring: structural channel or welded plate minimum ASTM A36. C. Fasteners: ASTM A325 high strength bolts and A563 high strength nuts, ASTM A36 anchor bolts, self-drilling screws, rivets. ROOF SYSTEM: A. Metal Roofing: 24-gauge galvalume factory finish with Kynar 500 paint system. Roof shall be Multi-Rib or Standing Seam and angles shall be factory cut. Ribs shall run with the pitch of the roof for proper Drainage. Color shall be selected from the manufacturer’s standard color chart: [Patrician Bronze] B. Metal roofing trim shall match the color of the roof and shall be formed from 26 gauge painted galvalume steel as follows: PANEL AND ENDCAPS shall be pre-bent to a “U” shape to fit over ridge end of roof panels. The inside of the “U” shall match the roof color. METAL RIDGE CAPS shall be preformed with a single central bend to match the roof pitch. They shall be hemmed on the sides. ROOF PEAK CAP shall be supplied on all buildings that do not have a cupola. “J” CHANNEL shall be shaped like a “J” with colored metal on the outside wrapped around 20 gauge galvanized steel core. “J” channel shall be applied all along the eave to strengthen and straighten the eave. Both colored metal and galvanized core shall have 7/16” weep holes 6” on center. EVE SPLICE CHANNELS shall be provided to fit behind “J” channel butt joints to create strength at the joint and maintain a straight eave line. SPECIAL “J” CHANNEL CORNER TRIM shall be provided which fits over the Main “J” channel to simplify final detailing of corners. FABRICATION: A. All base plates, stiffeners plates, U-clips, and end plates shall be factory welded into place and bolt connections holes shall be factory drilled. B. Welded connections shall be made by certified welders in accordance with AWS Specifications and be supervised by an AWS certified welding inspector. C. FACTORY FRAME FINISH shall be [Sandstone].