Loading...
Skip to main content
< Back to results

Painting-Office Space, Maintenance Garage Floors, and Fuel Tank-StarTran


Location
Nebraska
Publication Date
12/19/2019 11:56 AM EST
Closing Date
01/15/2020 08:35 AM EST
Issuing Organization
City of Lincoln/Lancaster County
Solicitation Number
Description

Specifications include, but are not limited to: The Contractor shall be responsible for the following tasks as identified below: 5.1. Office Space Painting 5.1.1. Contractor shall furnish labor, materials, and equipment to complete the painting of interior office space. 5.1.1.1. Three (3) office spaces, two (2) administrative/commons areas, conference room, two (2) restrooms, and two (2) hallways. 5.1.1.2. Wall surfaces shall be prepared to receive paint. 5.1.1.2.1. Remove wallpaper border, where applicable; 5.1.1.2.2. Patch holes; 5.1.1.2.3. Skim wall surfaces, where applicable; and 5.1.1.2.4. Sand wall surfaces, where applicable. 5.1.1.3. Wall surfaces shall receive two (2) coat of paint. 5.1.1.3.1. Paint shall be Sherwin Williams Emerald or equivalent 5.1.1.3.1.1. Interior Acrylic Latex; 5.1.1.3.1.2. Finish shall be in Eggshell; and 5.1.1.3.1.3. Color selections shall be provided by the City. 5.2. Fuel Tank Painting 5.2.1. Contractor shall furnish labor, materials, and equipment to complete the painting of an above-ground fuel tank. 5.2.1.1. Fuel tank shall be prepared to receive paint. 5.2.1.1.1. Scrape existing paint from tank; and 5.2.1.1.2. Prepped with urethane primer. 5.2.1.2. Fuel tank shall receive top coat of urethane paint. 5.2.1.2.1. Color shall be white; 5.2.1.2.2. Tank shall be labeled as “DIESEL” with 5 inch lettering in red. 5.3. Garage Floor Painting and Striping 5.3.1. Contractor shall furnish labor, materials, and equipment to complete the painting and striping of the garage floor. 5.3.1.1. Floor shall be prepared to receive paint; 5.3.1.1.1. Scrape existing paint from floors; and 5.3.1.1.2. Prep/prime floor to receive paint. 5.3.1.2. Floors shall receive epoxy paint; and 5.3.1.2.1. Color: Grey. 5.3.1.3. Floors shall receive safety striping; 5.3.1.3.1. Color: Safety Yellow. 5.4. DISPOSITION OF CONSTRUCTION MATERIALS 5.4.1. Contractor shall be responsible for the removal and disposal of all construction related materials from the site, at their expense

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids