Specifications include, but are not limited to: Item 1 – Mobilization- Mobilization shall be measured as a lump sum and paid for at the contract unit price. Mobilization will include bond costs, insurance costs, sanitary facilities, and other incidentals for the complete construction of the project.Item 2 – 6” Concrete Pavement– 6” Concrete Pavement shall be measured as a Square Foot (SF) item and paid for at the contract unit price. 6” Concrete Pavement will include all labor, materials, and accessories necessary to furnish and install 6” Concrete Pavement Complete in place.Item 3 – Bus Shelters (complete with concrete footings) - Bus shelters shall be measured as an each and paid for at the contract unit price. Bus Shelters shall include all labor, materials, and accessories necessary to install bus shelter and concrete footings complete in place. The materials shall include, but not limited to, bus shelter, installation hardware, shims and epoxies. Price shall include costs for engineer certified shop drawingsItem 4 – 6’ Backless Bench - Bench shall be measured per each and paid for at the contract unit price. Bench shall include all labor, materials, and accessories necessary to install the 6’ backless bench complete in place. The materials shall include, but not limited to, installation hardware, shims, and epoxies. Item 5 – Site Restoration – Site Restoration shall be measured per lump Sum and paid for at the contract unit price. Site Restoration shall include all labor, materials, and accessories necessary to restore areas disturbed by construction, complete in place. The materials shall include, but not limited to, grading, topsoil and sod to restore lawns adjacent to concrete pavement.