Specifications include, but are not limited to: TYPE ‘A’ SAWING: Asphaltic Concrete pavement to be removed shall be isolated from the pavement to remain by cutting a full depth saw cut, using either a wheel saw or diamond blade. If a wheel saw is used, additional sawing shall be required to provide smooth, straight, and vertical faces. After the pavement base has been replaced, a 4" wide strip of the asphaltic concrete surface course shall be sawed and removed to provide a straight, smooth edge where the new asphaltic surfacing adjoins the existing surfacing; TYPE ‘B’ SAWING: Portland Cement Concrete (PCC) pavement to be removed shall be isolated from the paving to remain by cutting a full depth saw cut, using either a wheel saw or diamond blade. If a wheel saw is used, additional sawing shall be required to provide smooth, straight and true vertical faces.; A Quality Control (QC)/Quality Assurance (QA) meeting with the Engineer, Project Manager (PM), Contractor, subcontractors, testing laboratories, and consultant must be held at least 15 business days prior to start of construction. The QC/QA meeting will be facilitated by the Contractor at the City of Lincoln’s Office. The Contractor shall coordinate with the with the Engineer and Project Manager on time of the QC/QA meeting. Items to be addressed, at a minimum, will include: • Review of the CQCP including submittals, QC Testing, Action & Suspension Limits for Production, Corrective Action Plans, Distribution of QC reports, and Control Charts.; • Discussion of the QA program.; • Discussion of the QC and QA Organization and authority including coordination and information exchange between QC and QA.; • Establish regular meetings to discuss control of materials, methods, and testing.; • Establishment of the overall QC culture.