The contractor shall perform the following scope of work: • Demolition of existing Motor Control Center MCC 1E, transformer, and power panel o Existing motor control center will be demolished once new MCC is in service • Installation of City of Hastings supplied electrical equipment o Install new motor control center MCC 1E directly behind existing MCC (Dwg No. E103) o Install new 45 KVA 480-120/208V transformer (Dwg No. E103) o Install new power panel LP1E (Dwg No. E103 & E106) o Rewire existing outlets fed from existing MCC 1E and transformer to new power panel LP1E. • Supply and Install all power wiring including: o From Precipitator SUS to new MCC 1E – new 400-amp breaker will be provided and installed by COH in Precipitator SUS o From MCC 1E and Power Panel LP1E to loads at fly ash silo including motor loads and equipment