Specifications include, but are not limited to: GROUP 1 GRADING 0001 0030.10 MOBILIZATION 1.000 LUMP 0002 1009.00 GENERAL CLEARING AND GRUBBING 1.000 LUMP 0003 1010.01 EXCAVATION (ESTABLISHED QUANTITY) 300.000 CY 0004 1011.00 WATER 144.000 MGAL 0005 1030.00 EARTHWORK MEASURED IN EMBANKMENT 6697.000 CY 0006 1102.00 REMOVE ASPHALT SURFACE 1850.000 SY 0007 1702.36 36" DRIVEWAY CULVERT PIPE, TYPE 3,4 OR 5 120.000 LF 0008 4050.01 EXCAVATION FOR PIPE, PIPE-ARCH CULVERTS, AND HEADWALLS 782.000 CY 0009 4360.24 24" METAL FLARED-END SECTION 2.000 EACH 0010 4360.30 30" METAL FLARED-END SECTION 2.000 EACH 0011 6105.02 ROCK RIPRAP, TYPE B 80.000 TON 0012 7017.00 REMOVE GUARDRAIL 4010.000 LF 0013 P402.24 24" CULVERT PIPE, TYPE 3,4,5 OR 6 164.000 LF 0014 P402.30 30" CULVERT PIPE, TYPE 3,4,5 OR 6 209.000 LF