Specifications include, but are not limited to: This part consists of the general provisions necessary when furnishing and installing the Traffic Signalization Works as described in the project plans and these special provisions. The project includes 61 signalized intersections and the limits of work are generally bounded by 192nd Street on the west, 99th Street on the east, Ida Street on the north and Blondo Street on the south. This project involves supplying and installing conduit, fiber optic cables, hand holes, pull boxes, devices, device cabinets and footings, tracer wire and pull tape, power supplies and cabling, and power terminations deemed necessary for a complete traffic signal installation. This project work involves deploying fiber optic communication, other communication media, and network devices to the field devices to provide communications from the traffic signal system to the City Traffic Operations Center (TOC).