Specifications include, but are not limited to: Construction Phase I This phase of the project generally includes median barrier removal and the construction of the temporary pavement for the traffic crossovers, as shown on the plans. This work will include removal of the existing median and median barrier. During the construction work on this phase, traffic on Rosa Parks Way shall be reduced to one lane in each direction and shifted to the outside lane. Construction Phase II This phase of the project generally includes the removals and construction of the approach slab and paving section on the left structure, as shown on the plans. This work will include the installation and removal of temporary traffic control measures. During the construction work on this phase, traffic on Rosa Parks Way shall be head to head on the right structure while work is being done on the left structure. Construction Phase III This phase of the project generally includes the removals and construction of the approach slab and paving section on the right structure, as shown on the plans. This work will include the installation and removal of temporary traffic control measures.