Specifications include, but are not limited to: WA-387 - Garfield and New York Ave - Contractor to install 1” PE line from the newly installed stop box to the noted tie in point listed on the attached addresses. Tie in point determined by current service material. 15 services WA-386 - Home St. 11th St. and 12th St. - Install new service to existing meter location or as approved by Hastings Utilities, install existing meter with 2 new ball valves on each side of meter or at a location agreed upon by Hastings Utilities and property owner. Hastings Utilities to locate existing stop box. Contractor will shut off existing stop box and remove min 12” of stop box and fill with dirt or concrete. If service stop box cannot be found contractor will dig up at main and shut off corporation cock. Install tap, corp, stop box and install a new 1” PE service from the new 8” DIP main on South side of Home st. to the houses on both North and South sides of the street. 19 services Install tap, corp, stop box and install a new 1” PE service from the existing 10” DIP main on South side of 11th st. to the houses on the North side of the street.