1. Remove and Reset Sign The bid item REMOVE AND RESET SIGN shall include furnishing and installing all components, including labor, materials, and equipment necessary to remove each sign, sign post, sign post anchors, any required ground sleeves, and reset the assembly to the original condition including any required ground sleeves as described in DIVISION 400 – LIGHTING, SIGNS, AND TRAFFIC CONTROL of the Nebraska Department of Transportation Standard Specifications for Highway Construction, 2017 Edition. Quantities will be measured and paid for by Each for this work. 2. Remove and Reset Mailbox The bid item REMOVE AND RESET MAILBOX shall include all labor, materials, and equipment necessary to remove each mailbox assembly including footing, post, and mounting hardware to accommodate project construction and re-establish it in like condition following the project according to guidance provided by the US Postal Service and the local Postmaster. Work included shall also include any and all temporary accommodations necessary to maintain mail service during construction, including but limited to establishment of temporary mailboxes. Quantities shall be measured and paid for by Each for this work. 3. Area Inlet The bid item AREA INLET shall include furnishing all labor, materials, equipment, tools, and all incidentals necessary to construct a storm sewer structure. Materials shall be in accordance with SECTION 916 – CATCH BASINS, MANHOLES, INLETS, AND JUNCTION BOXES of the Nebraska Department of Transportation Standard Specifications for Highway Construction, 2017 Edition. Quantity will be measured and paid for by Each for this work. The Area Inlet details can be found in the City of Omaha Standard Plate 702-08.