Contractor to supply all materials, labor, and equipment to install approximately ±8,039 linear feet of conduit for a new fiber optic route by means of horizontal directional drilling. Eight in-ground pull boxes with tracer wire test stations are to be incorporated at various locations to break up the project into manageable lengths. All of the in-ground pull boxes will be interconnected by at least two 1¼” conduits, with some locations connected by three conduits. Terminating the conduits that exit pull boxes to serve a facility building are also specified in the drawings. This project will enable Hasting’s personnel to 1). Add additional equipment and appurtenances to penetrate inside facility buildings, and 2). Run new fiber from Crane Avenue to the Don Henry Power Center. Locations and materials are detailed specifically in the attached drawings.