Specifications include, but are not limited to: 1. A 72 HOUR BURN IS NOT REQUIRED ON INSTALLATIONS USING LED LUMINAIRES.; 2. FOR PULL BOX DETAILS, SEE STANDARD PLAN 914. ALL PULL BOXES WITH METAL FRAME AND LID SHALL BE GROUNDED, UNLESS INDICATED OTHERWISE.; 3. ALL CONNECTIONS IN PULL BOXES WILL BE MADE USING SUBMERSIBLE SECONDARY CONNECTORS MEETING ANSI C119.1 REQUIREMENTS.; 4. ELECTRICAL CONNECTIONS IN POLE OR TRANSFORMER BASE SHALL BE MADE USING U.L. APPROVED, MULTI-CABLE, DUAL RATED, MECHANICAL CONNECTOR BLOCKS WITH ALLEN HEAD SET SCREWS, THE CONNECTOR BLOCK SHALL BE COMPLETELY ENCASED IN A SILICONE GEL OR FULLY SURROUNDED BY A MOLDED INSULATING COVER. CONNECTORS SHALL BE RATED 600 VOLTS. COMPRESSION TAPS AND TAPING WILL NOT BE ALLOWED.; THE CONNECTOR BLOCK MUST CONTAIN THE CORRECT NUMBER OF CABLE ENTRANCES TO ALLOW ONE CONDUCTOR PER WIRE HOLE AND MUST BE RATED FOR THE SIZE(S) AND TYPE(S) OF CABLE BEING USED. ANTIOXIDANT COMPOUND SHALL BE USED AND PROPER PROCEDURES FOLLOWED.; 5. AN EQUIPMENT GROUNDING CONDUCTOR SHALL BE BONDED: (A) TO ALL POLES OR TRANSFORMER BREAKAWAY BASES.; (B) AT ALL CONTROL CENTER SERVICE LOCATIONS.; (C) TO ALL METALLIC NONCURRENT CARRYING COMPONENTS.; (D) TO ALL GROUND RODS.; 6. IN PULL BOXES, POLE BASES, JUNCTION BOXES AND CONTROL CABINETS, THE DIRECTION OF EACH CABLE RUN SHALL BE INDICATED BY ATTACHING A PERMANENT TAG OF RIGID PLASTIC OR NON-FERROUS METAL TO THE CONDUIT. TAGS SHALL BE EMBOSSED, STAMPED OR ENGRAVED WITH LETTERS ‰'' OR GREATER IN HEIGHT AND SECURED TO THE CONDUIT WITH NYLON OR PLASTIC TIES.; 7. CONDUIT SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 405 OF THE "STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION".; 8. ALL METALLIC AND NONMETALLIC CONDUIT SHALL BEAR THE U.L. LABEL.