EXAMINATION A. Verify roof openings, curbs, pipes, sleeves, ducts, and vents through roof are solidly set, reglets in place, and nailing strips located. B. Verify roofing termination and base flashings are in place, sealed, and secure. 3.02 PREPARATION A. Install starter and edge strips, and cleats before starting installation. B. Back paint concealed metal surfaces with protective backing paint to a minimum dry film thickness of 15 mil, 0.015 inch (0.38 mm). 3.03 INSTALLATION A. Secure flashings in place using concealed fasteners, and use exposed fasteners only where permitted. B. Apply plastic cement compound between metal flashings and felt flashings. C. Fit flashings tight in place; make corners square, surfaces true and straight in planes, and lines accurate to profiles. D. Secure gutters and downspouts in place with concealed fasteners. E. Connect downspouts to downspout boots, and seal connection watertight. F. Set splash pads under downspouts.