Specifications include, but are not limited to: provide all labor and materials for the DEC WHM Hot Water Valve Inspection and Repair Work; Flowable Fill, QTY 20 Per CY; Earthwork – (Imported Backfill), QTY 50 Per CY; Shoring Complete Including Installation & Abandon In Place, QTY 1500 Per SF; Prefabricated Insulated Std. Wt. Carbon Steel Piping (Thermacor) Complete 6” Pipe, QTY 20 Per LF; 12” Pipe, QTY 20 Per LF; Prefabricated Insulated Pipe Jacket Insulation Joint Kit Complete (Thermacor) 6” Pipe, QTY 12 Per Each; 12” Pipe, QTY 12 Per Each; Saw Cut Existing Pavement, QTY 200 Lineal Foot; Remove Existing Pavement, QTY 50 Cubic Yard; 7” PCC Pavement, QTY 64 Square Yard; Concrete Curb & Gutter, QTY 60 Lineal Foot; 5”Concrete Sidewalk, QTY 30 Square Foot; Remove Jersey Barrier, QTY 10 Each; Reset Jersey Barrier, QTY 10 Each; Sodding, QTY 200 Square Foot