The Work shall consist of all items which will result in a functionally complete project in accordance with the specifications and drawings and includes, but is not limited to, the following: • Procurement and installation of new water hydrant and approximately 30-ft of water line to connect a new hydrant to an existing water well. The water line connection includes the following components: o 3” true union from water well 3” threaded connection o 3” to 4” reducer from true union o 4” tee o 4” wedge gate valve installed horizontally from 4” tee o 4” cap with trust block from 4” wedge gate valve. o 4” wedge gate valve o Flanged coupling adapter (from PVC to DIP) o DIP riser and hydrant with thrust block • Procurement and installation of five bollards • Procurement and installation of two valve boxes. • Procurement and installation of pump control panel with communication module and radio and connection to existing electrical panel. • Procurement and installation of a water level sensor. • Procurement and installation of electrical conduit and conductors to supply power to the existing groundwater pump installed in the well.