Specifications include, but are not limited to: Hot Patch Material – Paver Placed will be Mix Type SPR as specified in the City of Omaha Asphalt Standard Requirements (Effective 01/01/2013), which is attached. Binder shall be PG64-34. Hot Patch Material – Hand Placed will be Mix Type SPR Fine as specified in the City of Omaha Asphalt Standard Requirements (Effective 01/01/2013), which is attached. Binder shall be PG64-22. Hot Patch Material – Special will be Mix Type SPR Fine as specified in the City of Omaha Asphalt Standard Requirements (Effective 01/01/2013), which is attached. Binder shall be PG64-22. Hot Patch Material – Special is supplied during cold weather months as further described herein in the Payment section. The minimum temperature at delivery will be 300 degrees Fahrenheit measured at the rear door of the receiving vehicle.