Specifications include, but are not limited to: West Highschool – West Campus has an existing water-cooled chiller, cooling tower and associated pumps which WCS desires to replace as they are near the end of their useful life and experiencing major failures. The project includes but is not limited to the following major elements: Removal of the existing chiller. Removal of the existing chilled water pump. Removal of the existing cooling tower. Removal of two existing condenser water pumps. Removal of existing CWS / R piping to accommodate chiller replacement. Removal of existing CS / R piping to accommodate chiller replacement. General demolition to accommodate project. Installation of one new air-cooled chiller, chilled water pumps and associated controls. Installation of new VFDs for new chilled water pumps Installation of new CWS / R piping. Commissioning new equipment and controls. Electrical modifications to accommodate new mechanical equipment. General Construction to accommodate new mechanical equipment.