The work contemplated in the Proposal consists of the realignment of an unnamed tributary of Buffalo Creek to move the channel away from Buffalo Road. The new channel will be stabilized with a rock riprap liner. 1 112 MOBILIZATION 1 LS $ $ 2 202 GENERAL CLEARING AND GRUBBING 1 LS $ $ 3 SP-01 TRAFFIC CONTROL 1 LS $ $ 4 202 LARGE TREE REMOVAL 2 EA $ $ 5 203 REMOVE CULVERT PIPE 201 LF $ $ 6 SP-02 REMOVE AND RESET HIGHWAY SIGN AND POST 1 EA $ $ 7 SP-03 REMOVE AND SALVAGE GUARDRAIL 682 LF $ $ 8 SP-04 REMOVE GRANULAR SURFACING 760 SY $ $ 9 207 SALVAGING AND PLACING TOPSOIL 3,173 CY $ $ 10 SP-05 AMENDED TOPSOIL 1,475 SY $ $ 11 SP-06 EXCAVATION 53,370 CY $ $ 12 SP-07 EXCAVATION – HAUL OFF 2,000 CY $ $ 13 SP-08 RIPRAP BEDDING 3,030 CY $ $ 14 SP-09 ROCK RIPRAP, TYPE C WITH CHOKESTONE 20,350 TN $ $