Specifications include, but are not limited to: The work is generally described as follows: Improvements include approximately 11,500 SY of removals and 9,000 SY of pavement including an intersection conversion into a roundabout. 600 linear feet of 48” RCP storm sewer and 10 storm inlets with associated laterals. 60’-0” long IT girder bridge and 225 linear feet of modular block retaining wall. 19 street lighting fixtures with associated conduit. 1800 LF of Instream Improvements to the North Fork River, 0.73 Acres of Wetland mitigation, 4,500 CY of embankment and 8 instream boulder/rock grade structures. Temporary and permanent traffic control, extensive grading, and water mains are also appurtenances of the project.