Specifications include, but are not limited to: This Project consists of a Base Bid and two Additive Alternates (Additive Alternate 1 and Additive Alternate 2). The Base Bid will consist of, but is not necessarily limited to, providing all labor, materials, earthwork, and incidentals necessary to remove, haul, and place approximately 8,350 cubic yards of mine waste material located at different locations within the Project area at a stockpile area located near the Luttrell Repository within Basin Creek Mine; clearing, grubbing, and stockpiling of vegetative materials; improving/constructing, maintaining, and reclaiming/restoring haul roads; temporary modification to existing bridges along the designated primary haul road; installing and removing a temporary bridge across the Little Blackfoot River to access mine waste; installing, maintaining, and removing storm water erosion controls; installing and removing dewatering inlet basins and associated pipe lines within the Tramway Creek drainage; installing and removing a temporary stream diversion within the Little Blackfoot River; construction of a vegetative streambank stabilization feature along approximately 100 feet of the Little Blackfoot River; developing and reclaiming a borrow area at the top of the Tramway Creek drainage; stockpiling of materials at the borrow area; organic amendment of borrow area materials; hauling, placing, and spreading borrow area materials; regrading and revegetating disturbed areas; and spreading slash.