Specifications include, but are not limited to: Provide all labor, materials, equipment and incidentals necessary to produce 3,500 tons or 2,333 cubic yards of sanding material. Add 15% contractor furnished salt by weight to 2,250 tons of sanding material or add 15% contractor furnished salt by weight to 1,500 cubic yards of sanding material. Contractor is required to stack all blended material in salt sand storage facility. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff.; Provide all labor, materials, equipment and incidentals necessary to produce 5,250 tons or 3,500 cubic yards of sanding material. Add 15% contractor furnished salt by weight to 2,625 tons of sanding material or add 15% contractor furnished salt by weight to 1,750 cubic yards of sanding material. Contractor is required to stack all blended material in salt sand storage facility. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff