Specifications include, but are not limited to: Provide all labor, materials, equipment, traffic control and incidentals necessary to crack seal 10 miles of road on route S-346. Average roadway width is 30.5 feet. Cracks shall be routed and sealed per the special provisions. Existing crack seal material that is not pliable, detached from the plant mix surfacing, or is deteriorated must be routed, removed, and replaced. Existing crack seal material that is pliable and still attached to the plant mix surfacing may require a thin crack seal treatment placed over the existing crack seal. The Project Manager or designee will determine if existing crack seal requires removal or thin crack seal treatment. A squeegee or cup on the want, approved by the Maintenance Chief, must be used to seal all longitudinal cracks.