Specifications include, but are not limited to: • Construction of a new lift station including installation of owner-supplied submersible pumps in the new wet well along with associated piping, valves and fittings; • Construction of a new valve vault. Vault will house check valves, plug valves, ductile iron pipe, pipe supports, magnetic flowmeter and other appurtenances; • Demolition of the existing lift station dry pit and ancillary equipment; • Bypass pumping and temporary piping of wastewater flows during construction; • Conversion of existing wet well into a new manhole; • Miscellaneous electrical and control modifications; • Finish grading, asphalt paving and restoration of areas disturbed during construction. This work includes the furnishing and installation of equipment, materials and related appurtenances in the following trades: piping, concrete, landscaping, paving and other related trades. The work will be done under a single contract.