Loading...
Skip to main content
< Back to results

Overlay and Chip Seal Westside Frontage Road Lima Butte Area


Location
Montana
Publication Date
07/16/2020 10:39 AM EDT
Closing Date
08/03/2020 04:00 PM EDT
Issuing Organization
State of Montana - Department of Transportation (MDT)
Solicitation Number
Description

Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 4,192 tons of ¾” Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 24 feet wide. Overlay will consist of a total of 3.0 miles of plant mix, 1.5 miles on each end of the project. Milling of 120’ tapers will be required on each end of the overlay. There is 1 bridge on the project at approximately milepost 7.1. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 122,496 square yards of laid-in-place chip seal. The chip seal will be approximately 8.7 miles long and 24 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each workday as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .44 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Department will provide interim striping on the new overlay. Contractor will provide waterborne interim striping on the chip seal and epoxy final striping. Contractor is responsible for test trailer, transport, and setup. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will be changed accordingly depending on pickup and delivery locations and miles transported.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids