Loading...
Skip to main content
< Back to results

Overlay and Chip Seal Grave Creek North and Eureka South Kalispell Area


Location
Montana
Publication Date
03/13/2019 08:41 AM EDT
Closing Date
04/03/2019 05:00 PM EDT
Issuing Organization
State of Montana - Department of Transportation (MDT)
Solicitation Number
Description

Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 10,004 tons of ½” Commercial Plant Mix Grade S PG 64-28 asphalt mix material. A leveling course in areas to be determined of up to 250 tons per mile shall be placed and compacted prior to placing a .15’ thick and approximately 41-47’ wide overlay. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 89,115 square yards of laid-in-place chip seal. The chip seal will be approximately 3.77 miles long and 40-46 feet wide. Contractor shall provide CHFRS-2P asphalt emulsion and Type 1 chips. Traffic control with pilot cars must be maintained until dusk or fading light each work day as determined by the Project Manager. The emulsion application rate for chip seals is estimated at .45 gallons per square yard. The cover material application rate is estimated at 25 pounds per square yard. Actual application rates will be based on the chip design and the actual field adjustments. If the cover material application rate of 25 pounds per square yard is not sufficient to provide a quality job, the Project Managers will jointly determine what the new application rate should be. Contractor must furnish a water truck for dust control and wetting of chips. Arrangements must be made by the Contractor for acquiring water for wetting and sweeping. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs prior to the chip seal. The Department will provide final striping. Contractor is responsible for test trailer, transport, and setup if required. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will be changed accordingly depending on pickup and delivery locations and miles transported. A fog seal will be applied at the rate of 0.15 gallons per square yard of 50/50 cut asphalt emulsion CSS-1H. The Department will provide interim and final striping.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids