Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 6,338 tons of ½” Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 36-60 feet wide. A leveling quantity of 800 tons will be placed at the MDT Project Managers direction between MP 61.0 and 63.9 Milling work will include a 100’ taper mill at the beginning of the project along with a 265’ bridge end mill with a 100’ taper at the end of the project and two 10’ wide county road tapers for 350’. A 3’ wide apron shall be placed and compacted at 12 private approaches throughout the project for a total of 720’. Contractor is responsible for test trailer, transport, and setup. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. The quantity is estimated and will be changed accordingly depending on pickup and delivery locations and miles transported.