Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to mill approximately 1,066.67 square yards at 0.15’ depth. The milling locations will be at the project limits as well as two road intersections. First intersection is located at MP 3.15, Anderson Lane and Conrad Drive. Second intersection is located at MP 3.83, Conrad Drive and Shady Lane. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 2,817 tons of ½” Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved 0.15 feet thick and approximately 25 feet wide. Contractor shall provide all labor, equipment, materials, traffic control and incidentals necessary to produce, haul, place, roll and broom approximately 20,472 square yards of laid-in-place chip seal