Specifications include, but are not limited to: Snow removal work in these areas will occur between 6PM and 6AM or as needed. Removal of snow when snowfall is 1” or greater. Application of traction control materials to ensure safe transit of vehicles, pedestrians and other commuters. (During contract hours only) Application of traction control materials used for managing packed snow and ice. Mitigation of packed snow and ice buildup to ensure safe transit for vehicles, pedestrians and other commuters. Hauling of snow to ensure snow storage areas are ready to accept the next snow event. A “bare pavement” operation over the MSU’s Winter Break to ensure all areas of contractor responsibility are in the best possible condition practicable for the start of spring semester.