The project generally consists of a 2” asphalt overlay of Lake Helena Drive from the Causeway Bridge to the end of the asphalt on Hauser Dam Road, for a total length of approximately 5,110 lineal feet, and a 2” asphalt overlay of Floweree Road from the east end of the Ten Mile Creek Bridge, one mile south for a total length of approximately 5,280 lineal feet, in Lewis and Clark County. Asphalt Overlay, PG 70-28, MPW Type B Asphalt (Lake Helena) Ton 1,800 $ $ 2 Tack Coat, SS-1h (Lake Helena) Gallon 1,450 $ $ 3 Asphalt Milling (Lake Helena) SY 150 $ $ 4 Temporary Reflective Tabs (0.97 Miles, Lake Helena) LS 1 $ $ 5 Traffic Control ( 0.97 Miles, Lake Helena) LS 1 $ $ 6 Asphalt Overlay, PG 70-28, MPW Type B Asphalt (Floweree) Ton 2,100 $ $ 7 Tack Coat, SS-1h (Floweree) Gallon 1,850 $ $ 8 Asphalt Milling (Floweree) SY 90 $ $ 9 Temporary Reflective Tabs (1 Mile, Floweree) LS 1 $ $ 10 Traffic Control (1 Mile, Floweree) LS 1 $ $