Specifications include, but are not limited to: All work will be done in accordance with acceptable practices outlined by the respective City-County Health Departments as well as the State of Montana. A current State of Montana Septic License is required. Latrine and septic pumping will be done on an “as needed” basis; the specific number and location of the latrines and septic tanks to be pumped will be determined by FWP. Visitor usage will determine the actual number of pumpings needed to be made by the contractor. There is no guarantee as to the number of pumpings or total contract amount paid. Response time for the pumping must be no more than five (5) days after notification. Failure of the contractor to perform within five (5) days after notification for pumping places the contractor in default and FWP, at its sole discretion, may retain any other available septic contractor to perform the service.