Specifications include, but are not limited to: Road dust abatement at various Fishing Access Sites in Region 1 Kalispell management area on an “as-needed” basis averaging about three sites and 3,000 feet per year. Need may vary from year to year as determined by FWP personnel based on weather conditions, usage levels, budget availability and other factors. There is no guarantee as to annual or total contract amount. Cost includes all products, equipment, fuel, mobilization, demobilization and all other costs associated with application of product. The dust control product to be used for this contract will be Magnesium Chloride or Ammonium Lignosulfonate or a combination thereof. The dust abatement application must control the road dust a minimum of 4 months after application. If the applications fail before this time frame, the contractor will be required to reapply at the expense of the contractor. Magnesium Chloride solution must be a minimum of 30% concentration. A 14-foot minimum application width is required. An application of water on the road surface will be required prior to Magnesium Chloride application. Application of Magnesium Chloride is NOT to occur in the rain or if rainy conditions are prevalent.