Specifications include, but are not limited to: Cold milling, rut fill, PMS overlay, guardrail, bridge repair, crossovers, electrical, seal & cover and pavement markings on the I-15/I-90 Butte project located in Silver Bow County. The project begins at RP 222.8 and extends approximately 7.5 miles along Interstate Route 90 to RP 230.3, the project also continues north on Interstate Route 15 to RP 130.00. The project enters the Butte city limits at RP 226.731 and exits at RP 228.636. 103000000 TRAINING PROGRAM 500.000 HOUR 104030010 MISCELLANEOUS WORK 25,000.000 UNIT 104030045 MISCELLANEOUS ITEMS-EACH 12.000 EACH 109200005 MOBILIZATION 1.000 LS 208010150 TEMPORARY EROSION CONTROL-LS 1.000 LS 208010200 TEMPORARY EROSION CONTROL-FIXED 500.000 UNIT 210020170 TEST TRAILER-TRANSPORT,SETUP 15.000 MILE 401020045 PLANT MIX SURF GR S-3/4 IN 51,710.000 TON 401020255 HIGH TENSILE STRENGTH REINFORCING FIBER 6,787.000 LB 401020300 HYDRATED LIME 724.000 TON 402020095 ASPHALT CEMENT PG 70-28 3,259.300 TON 402020315 EMULSIFIED ASPHALT-TACK COAT 21,220.000 GAL 402020375 EMULSIFIED ASPHALT CHFRS-2P 764.700 TON 409000000 FINAL SWEEP AND BROOM 17.500 CRMI 409000020 COVER-TYPE 2 429,244.000 SQYD 411010000 COLD MILLING 419,301.000 SQYD 411011145 SINUSOIDAL RUMBLE STRIPS 28.300 MILE 552010041 REVISE JOINT 785.000 LNFT 552010060 REPAIR STRUCTURE 1.000 LS 552010160 BRIDGE DECK CRACK SEAL 4,228.600 SQYD 557010606 REMOVE BRIDGE RAIL 979.900 LNFT 562000000 CLASS A BRIDGE DECK POLY REPAIR 15.000 SQYD