Specifications include, but are not limited to: Provide all labor, materials, equipment, traffic control and incidentals necessary to clean cut ditches parallel to I-90 westbound between mile post 314.015 to 318.32 and between milepost 320.89 to 323.03. This includes hauling and stockpiling excess material to Bozeman Hill Stockpile at milepost 321.1. MDT will define location at stockpile for material. Work includes hauling and stockpiling excess material, reshaping ditch to original grade and slope, brooming/cleaning roadway including dust control and reseeding. Exact locations of work will be defined at pre-con meeting – or – MDT Maintenance Chief or designated MDT representative. These locations are subject to change as funding allows.