The project generally consists of Electrical and Controls work for the City of Billings BBWA Raw Water Delivery project. The project is divided into two Bid Schedules as further defined below: 1. Bid Schedule 1 a. General: Bid Schedule 1 includes all components necessary to power, control and operate the Raw Water Pump Station. b. Electrical and Controls associated with Raw Water Pump Station 1) Installation of General Contractor furnished Unit Substation 2) Variable Frequency Drives 3) Panels and transformer with equipment tags beginning with “RWPS” 4) Power and controls at Raw Water Pump Station 5) Lighting for canopies and pump station 6) Duct banks including wiring from connections at West End Water Treatment Plant to Antenna Tower sight to Raw Water Pump Sation unit substation and panels noted above 7) Antenna Tower and associated facilities 8) Duct banks including wire between Raw Water Pump Station, variable frequency drives and “RWPS” panels 2. Bid Schedule 2 a. Includes power, lighting and controls at the following facilities: 1) BBWA Unloader 2) Screen Structure 3) Canyon Creek Diversion Structure b. Includes duct bank and wire from Screen Structure to BBWA Unloader. c. Includes duct bank and wire from Raw Water Pump Station electrical and control facilities to the Screen Structure and to Canyon Creek Diversion Structure.