Schedule One includes improvements at the City’s Main Lift Station. The improvements at the Main Lift Station include upgrading the existing controls with level transmitters as the primary controls and floats as secondary controls; updating the ventilation system; installing a new backup generator; installing a new control panel; installing two, new electric trolleys and chain hoists; installing a gas monitor; removing and replacing all of the doors; installing a new tin roof; and modifications to the lifting equipment. Schedule Two includes improvements at the Birch Street Lift Station. The improvements at the Birch Street Lift Station include upgrading the existing controls with level transmitters as the primary controls and floats as secondary controls, installing a new electric trolley and chain hoist, installing a new control panel, removing and replacing the doors, installing a new tin roof, installing new motor starters, new alarms, upgrades to the ventilation system, and installing gas monitor.