Perform the duties of Installation Contractor to install equipment procured through the Bozeman WRF MCC Procurement Contract as well as the duties of Contractor of this Construction Contract which generally consists of acting as the General Contractor or Prime Electrical Contractor to complete planning, scheduling, demolition, installation, commissioning, closeout and other construction administration duties for the replacement of three (3) Motor Control Center (MCC) assemblies at the Bozeman Water Reclamation Facility (WRF). The three MCCs control the following critical unit processes: MCC-1 – UnitrolTM, controls miscellaneous pumps with 4+ motors totaling 73.5 hp; MCC 2 – anaerobic digester boiler room, controlling 8+ motos with a total load of 57.4 hp; and MCC-3 – gravity thickener and secondary clarifiers, controlling 4+ motors with a total load of 2.75 hp.