0010 104030010 MISCELLANEOUS WORK UNIT 10,000.00 0020 108000010 STRUCTURE ANALYSIS LS 1.00 0030 109200005 MOBILIZATION LS 1.00 0040 208010000 BMP ADMINISTRATION-LS LS 1.00 0050 208010200 TEMPORARY EROSION CONTROL-FIXED UNIT 500.00 0060 301020340 CRUSHED AGGREGATE COURSE CUYD 3.00 0070 402020375 EMULSIFIED ASPHALT CHFRS-2P TON 636.30 0080 403010255 CRACK SEALING LB 101,467.00 0090 403010257 CRACK FILLING-MASTIC LB 59,562.00 0100 409000000 FINAL SWEEP AND BROOM CRMI 23.20 0110 409000010 COVER-TYPE 1 SQYD 353,809.00 0120 501010125 PORT CEM CONC PAVE 9 IN SQYD 17.00 0130 618030015 TRAFFIC CONTROL-FIXED UNIT 500.00 0140 618030080 TRAFFIC CONTROL-LS LS 1.00 0150 619010062 SIGNS-ALUM SHEET INCR XI SQFT 162.80 0160 619010090 SIGNS-ALUM REFL SHEET XI SQFT 1,014.20 0170 619010210 RESET SIGNS-GUIDE EACH 2.00 0180 619010230 REMOVE SIGN EACH 126.00 0190 619010240 REMOVE SIGN-GUIDE EACH 5.00 0200 619010300 POSTS-TUBULAR STEEL LB 994.00 0210 619010310 POSTS-STEEL U SIGN LB 852.00 0220 619010450 POLES-TREATED WOOD 4 IN EACH 49.00 0230 619010460 POLES-TREATED WOOD 5 IN EACH 37.00 0240 619010740 FRANG SIGN POST BKWY-3 IN RD EACH 4.00 0250 619010744 FRANG SIGN POST BKWY-4 IN RD EACH 4.00 0260 619011090 DELINEATOR TYPE 1 EACH 806.00 0270 620011105 WORDS AND SYMBOLS-WHITE PAINT GAL 7.00 0280 620011260 WORDS AND SYMBOLS-WHITE EPOXY GAL 9.00 0290 620013000 STRIPING-WHITE PAINT GAL 846.00 0300 620013960 STRIPING-WHITE EPOXY GAL 1,128.00