The Project includes furnishing all labor, skill, equipment, and construction materials to improve safety, accessibility, operational efficiency, and process functionality at the Bozeman WTP. The scope includes: BID PACKAGE A: Fluoride Transfer Pump Spill Containment Improvements: Modifications to the fluoride transfer pump containment area to enhance operator accessibility, safety, and movement during maintenance. Work is defined in the Construction Drawings and Specifications. BID PACKAGE B: Membrane Backwash Recycle Improvements: Installing cross-connection process piping and valves to redirect backwash waste directly to the recycle lift station, bypassing the DAFT feed wet well. Work is defined in the Construction Drawings and Specifications. BID PACKAGE C: Pretreatment Basin Underflow Baffle Curb Modifications: Removing a concrete curb from underflow baffles to streamline sludge cleaning operations in the pretreatment basin. Work is defined in the Construction Drawings and Specifications. BID PACKAGE D: Headtower Recycle Flow Improvements: Improve discharge piping at the headtower to better integrate recycle flows with raw water streams, to improve reuse water capture and treatment. Work is defined in the Construction Drawings and Specifications.