Specifications include, but are not limited to: Slope flattening and shoulder widening on the SF 159 N of Hardin Slp Fltn project in Big Horn County. Work includes: grading, gravel, PMS overlay, drainage, fencing, guardrail, rumble strips, seal & cover and pavement markings. The project begins approximately 16 miles north of Hardin on State Primary Route 48 (MT 47) at RP 16.3 extending north to RP 17.9. 104030010 MISCELLANEOUS WORK 3,000.000 UNIT 104030065 MISCELLANEOUS ITEMS-LNFT 30.000 LNFT 109200005 MOBILIZATION 1.000 LS 203020375 EMBANKMENT IN PLACE 29,972.000 CUYD 203080100 TOPSOIL-SALVAGING AND PLACING 5,700.000 CUYD 208010150 TEMPORARY EROSION CONTROL-LS 1.000 LS 208010200 TEMPORARY EROSION CONTROL-FIXED 500.000 UNIT 301020340 CRUSHED AGGREGATE COURSE 8,639.000 CUYD 301020450 SPECIAL BACKFILL 1,348.000 CUYD 401020022 COMMERCIAL MIX-PG 64-28 2,288.000 TON 402020315 EMULSIFIED ASPHALT-TACK COAT 1,298.000 GAL 402020375 EMULSIFIED ASPHALT CHFRS-2P 51.900 TON 409000010 COVER-TYPE 1 28,890.000 SQYD 411011130 CENTERLINE RUMBLE STRIPS-TYPE 3 1.500 MILE 411011135 RUMBLE STRIPS 3.000 MILE 551020030 CONCRETE-CLASS GENERAL 2.500 CUYD 603000037 42 INCH-LINER PIPE 191.000 LNFT 603000050 GRANULAR BEDDING MATERIAL 100.000 CUYD 603000060 FOUNDATION MATERIAL 169.000 CUYD