Remove existing shingles and associated sheet metal flashing down to the wood substrate • Remove existing heat cable, set aside, and reinstall at the end of the job • Haul debris to the landfill • Inspect substrate for structural integrity • Install D-style edge metal around the perimeter of the building • Install ice and water shield around the perimeter according to building code • Install synthetic underlayment on the remaining substrate • Install metal in valleys • Install new sheet metal jacks and pipe boots • Install starter shingles around the perimeter • Install 30 year Owens Corning shingles • Install Owens Corning hip and ridge shingles • Replace front wood fascia and paint to match • Secure building permits and a temporary toilet • Provide two-year warranty