Contractor will provide all labor, equipment, materials incidentals and traffic control to cold mill approximately 75,798 square yards of roadway at a depth of .15 as directed by MDT's project manager. The Contractor is responsible for hauling and disposal of the generated cold millings. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 7,521 tons of ¾” Commercial Plant Mix Grade S 64-28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 34 feet wide. Contractor is responsible for test trailer, transport, and setup. If the Department decides to perform testing at an area lab, this bid item will be deleted from the contract. It will be the responsibility of the Contractor to determine the centerline and place reflective tabs after paving matching existing striping.