Install luminaires in accordance with Subsections 556.03.8 and 703.04.5. Check luminaires on the ground to ensure they provide the specified ANSI/IES light distribution pattern before mounting. Adjust the luminaires at night, as directed, to provide the best roadway light distribution. Notify the Project Manager when the luminaire system is complete. The luminaires may be put into operation when necessary for public use as directed by the Project Manager. 617.03.9 Advanced Flashing Beacons Furnish mounting hardware to mount the traffic signal and sign as shown in the Detailed Drawings. Furnish a traffic signal as specified in Subsection 703.08. Payment for the sign and its mounting is covered on the signing plans. 617.03.10 Conductors and Cable Install wiring in accordance with the NEC requirements. Neatly arrange and lace wiring in cabinets, junction boxes, and the like. Run conductors in conduit except inside poles. Remove all dirt and moisture from the conduit runs before pulling wiring. Use powdered soapstone, talc, or other approved lubricant when placing conductors in conduit. Run signal light conductors without splices from a terminal block located in the cabinet, compartment, or signal head to a similarly located terminal block. Splice conductors only where specified using approved watertight connectors. Locate connectors in pole bases to be easily accessible through the handhole. Furnish watertight connectors with midget ferrule type fuses.