PROJECT DESCRIPTION [102] Removal, disposal, and replacement of two damaged beams, deck repair, and other necessary work on the I-90 Bridge Repair-Bear Canyon project located in Gallatin County. The bridge is on Interstate Route I-90 Eastbound travel at RP 313.5 east of Bozeman (Exit 313 Bear Canyon Road). CONTRACT ID: EX126 PROJECT: AR 10774(0) 10774000000 I-90 BRIDGE REPAIR-BEAR CANYON SECTION: 0001 - MAJOR BRIDGE REHAB PROP LINE NO. ITEM NUMBER ITEM DESCRIPTION UNIT OF MEASURE QUANTITY 0010 104030010 MISCELLANEOUS WORK UNIT 20,000.00 0020 104030011 MISCELLANEOUS ITEMS-LS LS 1.00 0030 108000010 STRUCTURE ANALYSIS LS 1.00 0040 109200005 MOBILIZATION LS 1.00 0050 202020041 REMOVE STRUCTURE LS 1.00 0060 202020115 REMOVE DECK SQYD 91.40 0070 208010000 BMP ADMINISTRATION-LS LS 1.00 0080 208010200 TEMPORARY EROSION CONTROL-FIXED UNIT 500.00 0090 551020036 CONCRETE-CLASS STRUCTURE LOW CUYD 17.80 0100 552010140 TRANSVERSE DECK GROOVING SQYD 91.40 0110 555010200 REINFORCING STEEL-EPOXY COATED LB 5,870.00 0120 618030005 TRAFFIC CONTROL DEVICES CB UNIT 35,000.00 0130 618100001 MOTORCYCLE ADVISORY SIGN EACH 2.00 0140 618100005 PORTABLE VARIABLE MESSAGE SIGN EACH 5.00