RIGHT-OF-WAY CLEARING A. CLEAR LIMIT DEFINITIONS are shown in Section IX. SPECIFICATIONS AND DRAWINGS. B. CLEAR LIMIT MARKING: Clear limits for existing roads or new construction on the Cilly Ridge Road Project are not marked. Road center line for new construction is flagged in pink, and has two horizontal, yellow paint lines (one above and one below the pink centerline flag). Clear limits for all new construction are to be of sufficient width, which will vary by side-slope percent, to provide for the requirements. The first 1000-foot section of new road will require State’s Liaison approval after the clearing limits are cut before road construction begins, to ensure the cut clearing limits are wide enough to meet specifications based on the side slope. Clear limits for new construction are not marked. CLEARING LIMITS SIDESLOPE PERCENT ROAD WIDTH – 16 FT, out slope, no ditch CUT SLOPE RATIO - 1.00 (COMMON MATERIAL) FILL SLOPE RATIO – 1.50 UPHILL R/W (FT) DOWNHILL R/W (FT)