1. The work generally consists of: o Establish construction access to remote project site. o Placement of concrete (approx. 5 CY) in scour-damaged trench beneath Upper Spring Box. o Replacement of Upper Spring Box internal collection system, valves, and concrete lid panels. o Create log jam against upstream edge of Upper Spring Box. o Install barbed-wire fence and gate at Upper Spring Box. o Limited installation of riprap armoring utilizing large native cobbles. The contract may be awarded based on the OWNER’s best interests. The award will be based on the lowest cost combination of responsive, responsible bids, on the Base Bid and various Schedules, Alternatives, and Additive Alternates, as applicable, selected by the OWNER.