Specifications include, but are not limited to: LEAD-BASED PAINT: Inspection of coated surfaces within this structure indicate conditions exist that may cause lead exposure from lead-contaminated dust or lead-contaminated paint that is deteriorated or present in accessible surfaces, friction surfaces, and/or impact surfaces that could result in adverse human health effects. Therefore, lead abatement activites (permanent) and/or interim controls (temporary) are required. CO DETECTORS: Install units meeting current code requirements in house. Prefer hardwired units with battery backup. Require new batteries and inspection. SMOKE DETECTORS: Install units meeting current code requirements in house. Prefer hardwired units with battery backup. Require new batteries and inspection. ATTIC WIRING: Open junction box noted. Install code compliant junction box cover.