Construction of the Restroom Building and new septic field system
serving the restroom building. The restroom building will be heated using underslab hydronic
system heated by propane fueled boiler unit. The building envelope will be insulated and the
insulation will be installed under the entire building’s concrete floor slab. The flooring at public
access areas will be a seamless epoxy system with integral cove base. The hollow metal doors /
frames / hardware and metal clad wood awning windows are part of scope of work. The solid
surfacing countertops, plastic partitions, toilet rooms accessories are per construction documents.
The exterior envelope materials are: concrete masonry units, rigid continuous insulation , painted
wood siding and trim, pre-finished standing seam metal roofing with self-adhered underlayment
installed over plywood roof sheathing supported by pre-engineered wood trusses and glulaminated
trusses. The project scope includes General, Mechanical, Electrical, Plumbing trades,
and Excavation, Backfill, required for the complete building construction work. Septic Field
replacement is a part of this proposal and will be installed under this Contract. The Building
project contractors are to make final connections to respective trades site utilities.