Summary of Specifications:
Various major improvements to include NEW GATE STRUCTURE, CONNECT NEW ROTARY LOBE PUMPS, CENTRIFUGAL DRAIN PUMP, GRINDERS, AIR SUPPLY SYSTEM, INSTRUMENTS, CONTROL VALVES, ADD NEW PRIMARY SCUM HANDLING EQUIPMENT AND SCUM TANK MIXER, INSTALL NEW PIPING BETWEEN, CONVERT AND EXPAND AN EXISTING PUMP PIT, AND ADD A NEW BUILDING WITH PUMPS, PIPING, VALVES, VARIABLE SPEED DRIVES, AN ASSOCIATED CONTROL SYSTEM, HVAC, ELECTRICAL PANELS AND RELATED EQUIPMENT,ADD NEW NON-POTABLE PIPES, HYDRANTS, AND VALVES, AND CONNECT,ADD NEW BACKFLOW PREVENTION EQUIPMENT REPLACE SECONDARY SETTLING TANKS SCUM VALVES AND ADD A SCUM TANK MIXER. ADD NEW POTABLE WATER LINES. REPLACE A WATER METER. MODIFY AN EXISTING BUILDING TO BECOME A TRAINING CENTER, OFFICES AND LABORATORY. ADD NEW FLOW METERING TO THE FILTER EFFLUENT FLOW LINE, THE RETENTION BASIN OVERFLOW LINE, THE RETENTION DRAIN LINE, PROVIDE AND INSTALL ANY ADDITIONAL HARDWARE AND ELECTRICAL WIRING AND CONDUITS AND OTHER EQUIPMENT THAT MAY BE REQUIRED TO MAKE THE NEW EQUIPMENT FUNCTION PROPERLY AND TO CONNECT TO AN EXISTING PLANT CONTROL SYSTEM.