Installing 2,150 lineal feet of 8-inch ductile iron water main in public right-of-way along Burdette from E. Lewiston to Woodward Heights, Mapledale from Hilton to 275 feet east of the centerline of Hilton, and through Mapledale Park from the west property line to Chester.
Removal and replacement of 350 feet of PVC truss pipe sanitary sewer in the public right-of-way along Channing between Wanda to West End.
Included in the work is the replacement of existing gate valves and fire hydrants, 18 domestic water services and connections, approximately 2,200 square yards of concrete pavement removal and replacement, 5,500 square feet of sidewalk and ramp removal and replacement, 1,800 lineal feet of concrete curb and gutter removal and replacement, 2,500 square yards of cold milling HMA surface, 1,000 tons of HMA paving, lawn restoration and other miscellaneous work items.